MRO Magazine

News

Suncor Energy begins planned maintenance on Terra Nova

St. John’s, NL – Suncor Energy has begun planned maintenance on the Terra Nova Floating Production, Storage and Offloading facility (FPSO), located about 350 km southeast of St. John’s, NL.


St. John’s, NL – Suncor Energy has begun planned maintenance on the Terra Nova Floating Production, Storage and Offloading facility (FPSO), located about 350 km southeast of St. John’s, NL.

Approximately 160 employees and contractors will be involved in the work, which is expected to last approximately four weeks.

The planned maintenance is expected to support safe, reliable operation of the Terra Nova FPSO. The expected production impact has been factored into Suncor’s annual guidance.


Print this page

Related Posts



Have your say:

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>